fbpx

Passive Fire
Solutions

BOSS Batt - Double - Sealed with BOSS Ablative Coating

Specifications

Orientation: Floor; Wall
Substrate: Concrete; FR Plasterboard; Masonry; Korok; Special; AFS
Category: Blank
Material: Blank aperture
FRR: At least 120 ; At least 240
Type: Blank Opening
Substrate Thickness: Min 150mm; Any; Other; Min 100mm; Min 100mm ; Min 100mm
System Description: BOSS Batt - Double - Sealed with BOSS Ablative Coating
Report Reference:
Potters Reference:

Further product details

Product Related Downloads

© Potter Interior Systems 2024

Cart Item Removed. Undo
  • No products in the cart.