Client: John Paul College // C&I Systems
Completion date: October 2014
Contractor: Ronayne Construction
This natural silver anodised multi-slider system has been installed at John Paul College in Rotorua to divide classrooms. Shared learning environments are becoming increasingly popular, promoting and supporting collaborative and innovative teaching and learning to better meet the needs of students.The DS Series 100mm Top-Roller 3-slider system (centre-meeting) is a much lighter and cheaper alternative to using traditional Transpace operable walls, and provides the added advantage of allowing light through.
Featured products:
© Potter Interior Systems 2024