fbpx

Potters part in
“New Zealand Excellence”

The Wellington waterfront has drastically changed shape with the construction of the new Meridian Energy building. This masterpiece of modern ESD (Ecologically Sustainable Development) principles takes advantage of the latest in design and technology to be crowned as New Zealand’s first five Green Star building.

Potters’ Wellington branch manager worked closely with Fletcher Construction and Interiors to assist in implementing our Aluminium system into the internal fitout.

“It was quite a complex job, especially to match the stainless steel sample given to us by the Architect. Inex aluminium came to the party by organising a special run specially for this job” – Manager.

This job incorporated Potter Aluminium Systems 92 and 64mm partitioning suites anodised in a bronze metallic wash.

 

Meridian CS Images

 

 

 

© Potter Interior Systems 2024

Cart Item Removed. Undo
  • No products in the cart.